Timberlyne was selected by the architect to consult on design for a cost-effective yet eye-catching building method. We determined CLT would be cost-prohibitive but were able to offer GLD mass timber panels to achieve the desired finished space. Our team pre-installed all connections in shop, including beam extensions to support the glue-laminated decking panels.

News & Links:

Ready to Get Started?

Lets Connect